We plan, design and deliver quality designs with exceptional engineering concepts. we meet each and every demand of our clients considering the project specification. We rely on the main consultant standards while considering the demand set forth by each of client contractors.
Contractor: Inecsa - Inarsa
Consultant: Khatib & Alami
ENGINEERING CONSULTANT
Client: SWCC
Scope of Work
•Design & Engineering services to New Satellite Plants Phase 2 (Design & Engineering of Civil, Mechanical, Electrical & Instrumentation)
Contractor: Codes Construction
Consultant: Mirage Leisure & Development LLC
Client: EMAAR
Scope of Work
Acoustic & Vibration study for MEP equipment
Contractor: Freesia
Consultant: Studio 360
Client: Azizi Developers
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Al Arabia Electromechanical LLC
Consultant: LACASA Architectural Consultants
ENGINEERING CONSULTANT
Client: DIFC
Scope of Work
•Seismic study and support design for the fire fighting pipes
Contractor: Al Adrak Contracting Co LLC
Consultant: Model Engineering Consultants
Client: Ellington Development LLC
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: Al Muhanad
Consultant: QHC Architects & Engineers
Client: M/s Sharjah Islamic Bank
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Al Futtaim Engineering
Consultant: WME
Client: Yas Water World, Abu Dhabi
Scope of Work
•Seismic study and support design for the fire fighting pipes
• Stress analysis and support design for the chilled water and LTHW pipes
Contractor: First Gulf Company
Consultant: KEO International Consultants
Client: Red Sea Global
Scope of Work
Acoustic & Vibration study for MEP equipment
Hydraulic analysis for the chilled water, water supply and fire fighting network
Stress analysis and support design for the chilled water and water supply pipes
Contractor: PNC
Consultant: PNC Architects
Client: Sobha Capital LLC
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Spectrum Cube LLC
Consultant: Ae7
Client: Five & Devco Real Estate Development LLC
Scope of Work
•Stress analysis and support design for the chilled water pipes
Contractor: First Gulf Company
Consultant: Atkins Realis & Partners Overseas
Client: Red Sea Global
Scope of Work
Stress analysis and support design for the chilled water and water supply pipes
Hydraulic analysis for the chilled water, water supply and fire fighting network
Contractor:
Consultant: Cundall Consulting
Client: Saudi Research and Media Group
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Saifco Electromechanical LLC
Consultant: Khatib & Alami
Client: Mr. Kazim Abbas Vakil Vakil Ghulam Abbas & Hasnain Vakil Mohamed Ali Vahid Ali
Scope of Work
•Stress analysis and support design for the chilled water pipes
Contractor: Pivot Electromechanical
Consultant: NEXT Engineering Consultants
Client: Madinat Jumeirah Living
Scope of Work
Stress analysis and support design for the chilled water and water supply pipes
Contractor: China Railway 18th Bureau Group
Consultant: GCE Consultants
Client: Dubai National Invest Company
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Al Arabia Electromechanical LLC
Consultant: Ultra Architectural Consultancy
Client: Omniyat
Scope of Work
•Seismic study and support design for the FLS system
Contractor: Naffco
Consultant: WSP
Client: Department of Culture and Tourism
Scope of Work
Seismic study and support design for the fire fighting pipes
Contractor: GECO Mechanical & Electrical Co
Consultant: Architectural Academic Office
Client: Government Of Sharjah
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Shapoorji Pallonji Mideast L.L.C.
Consultant: ATKINS
Client: The Palm Jumeirah
Scope of Work
•Hydraulic analysis for the chilled water network
Contractor: Leaders Fort
Consultant: Mirage Leisure & Development LLC
Client: EMAAR
Scope of Work
Acoustic study of Generators
Contractor: International Electro-mechanical Services Co. LLC (IEMS)
Consultant: LACASA Architectural Consultants
Client: Nakheel Properties
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Al Futtaim Engineering
Consultant: WS ATKINS
Client: TRSDC (The Red Sea Development Company)
Scope of Work
•Seismic study and support design for the FLS system
Contractor: Al Futtaim Engineering
Consultant: WME
Client: Saudi Entertainment Ventures (SEVEN)
Scope of Work
Seismic study and support design for the FLS system
Contractor: Garah Electromechanical
Consultant: Chapman Taylor LLP
Client: Knowledge Economic City
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: PNC
Consultant: PNC Architects
Client: Sobha Capital LLC
Scope of Work
•Stress analysis and support design for the chilled water pipes
Contractor: Menasco
Consultant: Mimar Emirates Engineering Consultants
Client: Al Jada Development LLC
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: Entire Technical Services LLC
Consultant: IAN Binhams & Associates
Client: Pearl Azure Properties
Scope of Work
• Seismic study and support design for all MEP services
Contractor: BK Gulf LLC
Consultant: RED
Client: Etisalat Data Center Company Limited/ KHAZNA
Scope of Work
•Seismic study and support design for all MEP services
Contractor: Aikah
Consultant: Samadhin+ Associates Consulting Engineers
Client: Select Group
Scope of Work
Seismic study and support design for the fire fighting pipes
Contractor: Al Muhanad
Consultant: Engineering Consortium Consulting Engineers
Client: DAMAC
Scope of Work
• Acoustic study of MEP Equipments
Contractor: Hills & Fort
Consultant: Jouzy
Client: EMPOWER
Scope of Work
•Valve chamber design for the district cooling network
Contractor: BKG
Consultant: MEGIS / Edarat Group
Client: Sahayeb Data Park
Scope of Work
CFD analysis for the Data center IT equipmentss
Contractor: International Electro-mechanical Services Co. LLC (IEMS)
Consultant: Mirage Leisure & Development LLC
Client: EMAAR
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Al Muhanad
Consultant: QHC Architects & Engineers
Client: M/s Sharjah Islamic Bank
Scope of Work
•Acoustic study of MEP Equipments
Contractor: Zamil Projects
Consultant: Shaker Consultancy Group
Client: DR Sulaiman Al Habib Medical Group
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: Al Shirawi
Consultant: NEXT Engineering Consultants
Client: Dubai Holding Real Estate
Scope of Work
• Acoustic study of MEP Equipments
Contractor: Jord Industries
Consultant: ADPO Designers & Planners
Client: Government Of Dubai, Department of Civil Aviation
Scope of Work
•Surge analysis for the chilled water & condenser water pipes
Contractor: Al Futtaim Engineering
Consultant: Dubai Consultants
Client: Select Group
Scope of Work
Seismic analysis and support design of Fire fighting pipes
Contractor: Al Futtaim Engineering
Consultant: ATKINS
Client: Re:Al Futtaim Engineering
Scope of Work
• Acoustic study of FCUs
Contractor: PNC
Consultant: PNC Architects
Client: Sobha Capital LLC
Scope of Work
•Stress analysis and support design for the chilled water pipes
Contractor: PNC
Consultant: PNC Architects
Client: Sobha Capital LLC
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: PNC
Consultant: PNC Architects
Client: Sobha Capital LLC
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: PNC
Consultant: PNC Architects
Client: Sobha Capital LLC
Scope of Work
•Stress analysis and support design for the chilled water pipes
Contractor: Shapoorji Pallonji Mideast L.L.C.
Consultant: AECOM
Client: Red Sea Development Company
Scope of Work
Surge analysis for the water supply, irrigation, storm water and sewage network
Contractor: United Masters Electromechanical LLC
Consultant: Mirage Leisure & Development LLC
Client: EMAAR
Scope of Work
• Stress analysis and support design for the chilled water pipes & generator exhasut pipes
Contractor: Voltas Limited
Consultant: ATKINS
Client: DEWA
Scope of Work
•Structural support design for MEP equipments
Contractor: SMITHLINE REINFORCED COMPOSITES FZC
Consultant: DEWA
Client: DEWA
Scope of Work
Hydraulic analysis for the water network
Contractor: Naffco
Consultant: GAJ / Al Hadatha
Client: Serenia Residences Limited
Scope of Work
• Seismic analysis and support design of Fire fighting pipes
Contractor: Shapoorji Pallonji Mideast L.L.C.
Consultant: ATKINS
Client: The Palm Jumeirah
Scope of Work
•Stress analysis and support design for the chilled water pipes
Contractor: Al Shirawi
Consultant: NEXT Engineering Consultants
Client: Dubai Holding Real Estate
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: Aikah
Consultant: Arif & Bintouk
Client: Mohammed Bin Rashid Al Maktoum City, District One
Scope of Work
• Seismic study & support design for the fire fighting pipes
Contractor: Saifco
Consultant: Mirage
Client: EMAAR
Scope of Work
• Acoustic study of MEP Equipments
Contractor: EMT Electromechanical works LLC
Consultant: Mirage Leisure & Development LLC
Client: EMAAR
Scope of Work
Acoustic study of MEP Equipments
Contractor: Ecoval Trading LLC
Consultant: Dewan Architects & Engineers
Client: Qiddiya
Scope of Work
• Stress analysis and support design of hot water pipes
Contractor: BK Gulf LLC
Consultant: Atkins Realis & Partners Overseas
Client: Red Sea Development Company
Scope of Work
• Seismic stress analysis and supplort design for the chilled water system, water supply and FLS system
Contractor: Al Futtaim Engineering
Consultant: Erga Progress Engineering Consultants
Client: Eden House
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: Shapoorji Pallonji Mideast L.L.C.
Consultant: AECOM
Client: Red Sea Development Company
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: United Masters Electromechanical LLC
Consultant: LACASA Architectural Consultants
Client: Swiss Property
Project Status: Completed
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Entire Technical Services LLC
Consultant: IAN Binhams & Associates
Client: Pearl Azure Properties
Scope of Work
Seismic stress analysis and supplort design for the chilled water system, water supply and FLS system
Contractor: China Railway 18th Bureau Group
Consultant: Mirage
Client: EMAAR
Scope of Work
• Stress analysis and support design for the chilled water pipes
Contractor: Al Shirawi Electro-Mechanical LLC
Consultant: WSP
Client: TECOM Group
Scope of Work
• Stress analysis and supplort design for the chilled water system and seismic study for the FLS system. Acoustic study for the MEP equipments
Contractor: Bilt ME
Consultant: GAJ / Al Hadatha
Client: Serenia Residences Limited
Scope of Work
Seismic analysis and support design of LPG pipes
Contractor: Bilt ME
Consultant: Dubai Consultants
Client: Select Group
Scope of Work
• Seismic analysis and support design of LPG pipes
Contractor: Al Shirawi Retrofit
Consultant: Model Engineering Consultants
Client: Ellington Development LLC
Scope of Work
• Stress analysis and supplort design for the chilled water system and seismic study for the FLS system. Acoustic study for the MEP equipments
Contractor: Al Futtaim Engineering
Consultant: Khatib & Alami
Client: Dubai Festival City LLC
Scope of Work
Stress analysis & support design for the ETS room
Contractor: Al Futtaim Engineering
Consultant: Erga Progress Engineering Consultants
Client: Eden House
Scope of Work
• Acoustic study of HVAC equipments
Contractor: SSH
Consultant: DGCL
Scope of Work
• Stress analysis and supplort design for the chilled water system and seismic study for the FLS system. Acoustic study for the MEP equipments
Contractor: Voltas Limited
Consultant: U+A
Client: Red Sea Development Company
Scope of Work
Seismic stress analysis and supplort design for the chilled water system, water supply and FLS system. Hydraulic analysis for the chilled water & water supply system. Acoustic study for the MEP equipments
Contractor: Al Futtaim Engineering
Consultant: Erga Progress Engineering Consultants
Client: Eden House
Scope of Work
• Acoustic study of HVAC equipments
Contractor: Al Futtaim Construction LLC./EFECO Consultant: SSHIC INTERNATIONAL
ENGINEERING CONSULTANT
Client: EMAAR- The Lagoons Phase One LLC.
Scope of Work
•Flexibility evaluation of chilled water pipes as per ASME B 31.1
•Finite Element Analysis of Riser Anchor Support for CHW Pipes
Contractor: ALEC Engineering & Contracting L.L.C
Consultant: WSP
Client: EXPO 2020
Scope of Work
• STRUCTURAL VALIDATION OF SKYLIGHT RAHU`S, RAMP RAHU`S & TSF
• STRUCTURAL VALIDATION OF SECONDARY SUPPOPRTS
• Flexibility evaluation of chilled water pipes as per ASME B 31.1
• Pipe Support Evaluation and sizing.
Contractor: Al-Futtaim / Carillion/Voltas
Consultant: WSP/Hopkins Architect Dubai
Client: Dubai World Trade Centre
Scope of Work
• The scope includes the flexibility analysis of complete chilled water (Supply & Return) pipes lines of C1, C2 and C4 building, including the ETS room.
• Detailed project report with modelling details, input parameters, description of worst case scenarios, Stress Isometric drawing, Restraint summary, displacement reports etc.
Contractor: Nurol LLC/Trinity Engineering Services LLC
Consultant: NORR Architects & Engineers
Client: THE LAGOONS PHASE ONE - L.L.C
Scope of Work
•Flexibility evaluation of chilled water pipes as per ASME B 31.1
•API Pump Calculations
•Support Structural Calculations
SHAMS ABU DHABI
Contractor: Construction General Contracting House Ltd./MAPCO L.L.C.
Consultant: AECOM MIDDLE EAST LIMITED
Client: ALDAR PROPERTIES PJSC
Scope of Work
•Flexibility evaluation of chilled water piping network as per ASME B 31.1
•API Pump Calculations
•Support Structural Calculations & Evaluation
Contractor: CHINA STATE CONSTRUCTION ENGRG. CORP (MIDDLE EAST) (L.L.C.)
Consultant: ARCHGROUP
Client: EMAAR PROPERTIES CO. P.J.S.C.
Scope of Work
•Flexibility evaluation of chilled water piping network as per ASME B 31.1
•API Pump Calculations
•Support Structural Calculations & Evaluation
Contractor: Pluto Electro Mechanical Contracting LLC
Consultant: GCE Consultants
Client: Dubai International Real Estate
Scope of Work
Stress analysis and support design of chilled water pipes
Contractor: China Railway 18th Bureau Group
Consultant: Mirage
Client: Masdar City Services LLC
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: BK Gulf LLC
Consultant: STANTEC
Client: Masdar City Services LLC
Scope of Work
Stress analysis and support design for the Chilled water pipes & Seismic study for the FLS system
Contractor: ASGC
Consultant: Faithful Gould
Client: Masdar
Scope of Work
Seismic study for the FLS system
Contractor: Al Ashram Contracting LLC
Consultant: Model Engineering Consultants
Client: Ellington
Scope of Work
Stress analysis and support design for the chilled water pipes
Contractor: Kartec Services WLL
Client: One Eleven Holding W.L.L
Scope of Work
Support design for the chilled water pipes
Contractor: Global Fiber Glass
Consultant: AD Port
Client: AD Port
Scope of Work
Finite Element Analysis for the GRP underground tanks
Contractor: Global Fiber Glass
Consultant: AD Port
Client: AD Port
Scope of Work
Seismic study and restraint design for the electrical services
Contractor: AECOM
Consultant: AECOM
Client: Yas Water World
Scope of Work
Stress analysis & support design for the chilled water & Lot Temperature Hot Water pipes
Contractor: Airmech Oman
Consultant: Allied Consultants / Engineering Innovation Design & Consulting Co
Client: Sustainable Development & Investment company
Scope of Work
Stress analysis and support design for the chilled water system & condenser water system, Hydraulic study of chilled water & condenser water system, Acoustic study of cooling towers
Client: DUQM REFINERY & PETROCHEMICAL INDUSTRIES
Supplier Name: SKM AIR CONDITIOING LLC
Project No: JI-2037/SO0267
Project Location: Oman
Scope of Work:
The Dynamic study of Air conditioning equipment is conducted to qualify Equipment by analysis. The purpose is to establish the Seismic Capacity of the Equipment so that the equipment is operable after a seismic event and maintains structural integrity.
Client: DUBAI COMMERCITY
Project Details: P42 - UMM RAMOOL DEVELOPMENT UMM RAMOOL DUBAI.
Project No: 5502
Lead Consultant: P&T Architects and Engineers Ltd.
Main Contractor: International Electro-Mechanical Services Co. (L.L.C.)
Scope of Work:
• Seismic stress analysis of chilled water piping network as per ASME B 31.1
• API Pump Calculations
• Support Structural Calculations & Evaluation.
Client: MIRAL
Project Manager: EllisDon
Project No: C2
Consultant: GAJ Middle East
Main Contractor: Shapoorji Pallonji Mideast L.L.C
Scope of Work:
• Seismic study of the FIRE FIGHTING PIPES, SMOKE EXTRACT & PRESSURIZATION DUCT & CABLE TRAY as per ASCE-07 and to define lateral /Longitudinal bracing as per seismic lateral loads.
Client: Al tayer
Main Developer: REEM Developers
Project Consultant : APG
Main Contractor : Al FARA`A
Sub-Contractor : SEMCO
Project Location: MIXED USE DEVELOPMENT IN RAWDHAT - Abu Dhabi
Scope of Work:
Acoustic/Vibration study is carried out for AHUs, FAHUs, CHILLERS, FCUs, CHILLED WATER PUMP and FANS
Site/Location details : PROPOSED BUILDING (G + 5P + H.C + 43 TYPICAL + 1 SERVICE + ROOF)- AL MAMZAR, SHARJAH-UAE
Client : SHEIKH MOHAMMED BIN ABDULLAH ALQASMY
Consultant : SHARJAH ENGINEERING CONSULTANTS
Main Contractor : Al MAWARID GENERAL CONTRACTING
Sub-Contractor : AL MAWARID ELECTROMECHANIC LLC.
Scope of Work:
Acoustic/Vibration study is carried out for AHUs and FAHUs
Site/Project details : P42 - UMM RAMOOL DEVELOPMENT UMM RAMOOL DUBAI. CENTRAL UTILITY
Project Number : 5502
Client : DUBAI COMMERCITY
Lead Consultant : P&T Architects and Engineers Ltd.
Main Contractor : International Electro-Mechanical Services Co. (L.L.C.)
Scope of Work:
Surge and Hydraulic Analysis study of District Cooling Network using AFT package.
Project: THE ADDRESS RESIDENCES DUBAI OPERA
A2 / A3
Client: EMAAR PROPERTIES - PJSC
Lead Consultant : KHATIB & ALAMI
Main Contractor: TAV TEPE AKFEN INVESMENT CONSTRUCTION & OPERATION.
Sub Contractor: EFECO L.L.C
Scope of Work:
Surge Analysis study of Water Supply Lines and Gravity feed lines.
Project Number: J-166
Client : AL SHAIKHA RODHA BENT AHMED BIN JUMA AL MAKTOUM
Lead Consultant : ALHASHEMI
MEP. Consultant : GCE CONSULTANTS
Main Contractor : AL MALIK BUILDING CONT. CO. LLC
Sub Contractor : SAIFCO Electromechanical Works (LLC)
Scope of Work:
To study primarily the pressure distribution in the piping and the requirement of PRV station in floor branch piping of G+3 EMIRATES HOSPITAL QUSAIS BR. & G+5 PARKING BUILDING Project.
Project Number : C2
Client : MIRAL
Project Manager : EllisDon
Consultant : GAJ Middle East
Main Contractor : Shapoorji Pallonji Mideast L.L.C
Scope of Work:
The frame work consists of 28 no’s individual cassettes accommodating several MEP and allied utility lines, tracks, pipes etc. and the evaluation shall adhere to applicable design codes and standards to deduce the performance of the proposed structural framework.
Site/Location details : MOBILITY SIGNATURE PAVILION
Client : EXPO 2020
Local Consultant : WSP
Main/MEP Contractor : ALEC Engineering & Contracting L.L.C
Scope of Work:
· Modelling and FE Analysis of Secondary Beam, Drop Down Columns, and mounting frame.
· Structural Analysis (FEA) of support to validate for structural integrity against dead loads applicable.
Site/Location details : MOBILITY SIGNATURE PAVILION
Client : EXPO 2020
Local Consultant : WSP
Main/MEP Contractor : ALEC Engineering & Contracting L.L.C
Scope of Work:
Finite Element Analysis (FEA) of structure to validate for structural integrity against applicable loads for Deck slab structure.
Contractor: Meydan Sobha.
Consultant: Ae7
Client: Emaar
Scope of Work:
To examine the designed ventilation system for the car
parking area in the “Meydan One mall, Basement 1 using CFD. To simulate the ducted extract system and makeup air. The simulations are carried out to study the system requirements on basis of safety regulations and standards pertaining to Dubai civil defense. And also to check whether it meets the sufficient visibilities & temperatures in case of fire.
Contractor: Meydan Sobha.
Consultant: Ae7
Client: Emaar
Scope of Work:
• Carbon Monoxide Simulation carried out Following two references suggest that PPM level should be maintained at or below 30-35ppm.
• Abu Dhabi Occupational Safety and Health System Framework, Occupational Standards and Guideline Values (July 2016).
• AESG, Ambient Outdoor Air quality Standards in UAE
Contractor: Meydan Sobha.
Consultant: Ae7
Client: Emaar
Scope of Work:
• Each of 9 vehicles (out of maximum 187 cars, 5% cars are chosen) emitting 46.25mg/s à (reference: ASHRAE Handbook).
• Jet fans operating at maximum capacity.
Copyright © 2018 AAPL Consultants - All Rights Reserved.