The section show cases various projects executed by AAPL. Fe

Project profile

We plan, design and deliver quality designs with exceptional engineering concepts. we meet each and every demand of our clients considering the project specification. We rely on the main consultant standards while considering the demand set forth by each of client contractors.

Find out more


    Pipe Stress Analysis

    Contractor: Al Futtaim Construction LLC./EFECO
Consultant: SSHIC INTERNATIONAL ENGINEERING CONSULTAN

    Dubai Creek Harbour - Creek Horizon (Plot.A019)

    Contractor: Al Futtaim Construction LLC./EFECO Consultant: SSHIC INTERNATIONAL 

    ENGINEERING CONSULTANT

    Client: EMAAR- The Lagoons Phase One LLC. 

    Scope of Work 

    •Flexibility evaluation of chilled water pipes as per ASME B 31.1  

    •Finite Element Analysis of Riser Anchor Support for CHW Pipes  

    Expo 2020 - Mobility Signature Pavilion

     

    Contractor: ALEC Engineering & Contracting L.L.C

    Consultant: WSP

    Client: EXPO 2020

    Scope of Work

    • STRUCTURAL VALIDATION OF SKYLIGHT RAHU`S, RAMP RAHU`S & TSF

    • STRUCTURAL VALIDATION OF SECONDARY SUPPOPRTS

    • Flexibility evaluation of chilled water pipes as per ASME B 31.1 

    • Pipe Support Evaluation and sizing.

    PSA CHW Dubai World Trade Centre District

    Contractor: Al-Futtaim / Carillion/Voltas

    Consultant: WSP/Hopkins Architect Dubai

    Client: Dubai World Trade Centre 

    Scope of Work

    • The scope includes the flexibility analysis of complete chilled water (Supply & Return) pipes lines of C1, C2 and C4 building, including the ETS room.

     • Detailed project report with modelling details, input parameters, description of worst case scenarios, Stress Isometric drawing, Restraint summary, displacement reports etc.


    Creek Gate

    Contractor: Nurol LLC/Trinity Engineering Services LLC

    Consultant: NORR Architects & Engineers

    Client: THE LAGOONS PHASE ONE - L.L.C

    Scope of Work

    •Flexibility evaluation of chilled water pipes as per ASME B 31.1 

    •API Pump Calculations  

    •Support Structural Calculations 

    The Bridges, Phase 1 & 2

    SHAMS ABU DHABI

    Contractor: Construction General Contracting House Ltd./MAPCO L.L.C.

    Consultant: AECOM MIDDLE EAST LIMITED

    Client: ALDAR PROPERTIES PJSC

    Scope of Work

    •Flexibility evaluation of chilled water piping network as per ASME B 31.1 

    •API Pump Calculations 

    •Support Structural Calculations & Evaluation

    Downtown Views II

    Contractor: CHINA STATE CONSTRUCTION ENGRG. CORP (MIDDLE EAST) (L.L.C.)

    Consultant: ARCHGROUP

    Client: EMAAR PROPERTIES CO. P.J.S.C.

    Scope of Work

    •Flexibility evaluation of chilled water piping network as per ASME B 31.1 

    •API Pump Calculations 

    •Support Structural Calculations & Evaluation

    Seismic Studies & Vibration

    DUQM REFINERY-EPC2 (UTILITIES & OFFSITES)

    Client:  DUQM REFINERY & PETROCHEMICAL INDUSTRIES 

    Supplier Name: SKM AIR CONDITIOING LLC

    Project No: JI-2037/SO0267 

    Project Location: Oman 

    Scope of Work:

    The Dynamic study of Air conditioning equipment is conducted to qualify Equipment by analysis. The purpose is to establish the Seismic Capacity of the Equipment so that the equipment is operable after a seismic event and maintains structural integrity. 

    P42 - UMM RAMOOL DEVELOPMENT, DUBAI

    Client: DUBAI COMMERCITY 

    Project Details:  P42 - UMM RAMOOL DEVELOPMENT UMM RAMOOL DUBAI.  

    Project No:  5502 

    Lead Consultant: P&T Architects and Engineers Ltd.

    Main Contractor:  International Electro-Mechanical Services Co. (L.L.C.) 

    Scope of Work:

     • Seismic stress analysis of chilled water piping network as per ASME B 31.1 

     • API Pump Calculations 

     • Support Structural Calculations  & Evaluation.

    WARNER BROS. HOTEL- PROPOSED G+7 HOTEL

    Client:  MIRAL
    Project Manager:  EllisDon   
    Project No:  C2
    Consultant:  GAJ Middle East
    Main Contractor:  Shapoorji Pallonji Mideast L.L.C
    Scope of Work:
    •  Seismic study of the FIRE FIGHTING PIPES, SMOKE EXTRACT & PRESSURIZATION DUCT & CABLE TRAY as per ASCE-07 and to define lateral /Longitudinal bracing as per seismic lateral loads.

    Acoustic Analysis

    ACOUSTIC /VIBRATION STUDY REPORT OF MIXED-USE DEVELOPMENT IN RAWDHAT

    Client:  Al tayer 

    Main Developer:  REEM Developers

    Project Consultant : APG

    Main Contractor : Al FARA`A

    Sub-Contractor : SEMCO

    Project Location:  MIXED USE DEVELOPMENT IN RAWDHAT - Abu Dhabi 

    Scope of Work: 

    Acoustic/Vibration study is carried out for AHUs, FAHUs, CHILLERS, FCUs, CHILLED WATER PUMP and FANS

    PROPOSED BUILDING (G + 5P + H.C + 43 TYPICAL + 1 SERVICE + ROOF) AL MAMZAR

     

    Site/Location details : PROPOSED BUILDING (G + 5P + H.C + 43 TYPICAL + 1 SERVICE + ROOF)-    AL MAMZAR, SHARJAH-UAE
    Client : SHEIKH MOHAMMED BIN ABDULLAH ALQASMY
    Consultant : SHARJAH ENGINEERING CONSULTANTS
    Main Contractor : Al MAWARID GENERAL CONTRACTING
    Sub-Contractor : AL MAWARID ELECTROMECHANIC LLC.
    Scope of Work:
    Acoustic/Vibration study is carried out for AHUs and FAHUs

    Surge & Hydraulic studies

    P42 - UMM RAMOOL DEVELOPMENT, DUBAI.

    Site/Project details : P42 - UMM RAMOOL DEVELOPMENT UMM RAMOOL DUBAI.    CENTRAL UTILITY

    Project Number : 5502

    Client : DUBAI COMMERCITY

    Lead Consultant : P&T Architects and Engineers Ltd.

    Main Contractor : International Electro-Mechanical Services Co. (L.L.C.)

    Scope of Work: 

    Surge and Hydraulic Analysis study of District Cooling Network using AFT package.

    THE ADDRESS RESIDENCES DUBAI OPERA - A2 / A3

    Project: THE ADDRESS RESIDENCES DUBAI OPERA 

     A2 / A3

    Client: EMAAR PROPERTIES - PJSC

    Lead Consultant : KHATIB & ALAMI

    Main Contractor: TAV TEPE AKFEN INVESMENT CONSTRUCTION & OPERATION.

    Sub Contractor: EFECO L.L.C

    Scope of Work: 

    Surge Analysis study of Water Supply Lines and Gravity feed lines.

    G+3 EMIRATES HOSPITAL QUSAIS BR. & G+5 PARKING BUILDING

    Project Number: J-166

    Client : AL SHAIKHA RODHA BENT AHMED BIN JUMA AL MAKTOUM

    Lead Consultant : ALHASHEMI

    MEP. Consultant : GCE CONSULTANTS

    Main Contractor : AL MALIK BUILDING CONT. CO. LLC

    Sub Contractor : SAIFCO Electromechanical Works (LLC)

    Scope of Work: 

    To study primarily the pressure distribution in the piping and the requirement of PRV station in floor branch piping of G+3 EMIRATES HOSPITAL QUSAIS BR. & G+5 PARKING BUILDING Project.


    Structural Analysis

    WARNER BROS. HOTEL- PROPOSED G+7 HOTEL

    Project Number : C2

    Client : MIRAL

    Project Manager : EllisDon

    Consultant : GAJ Middle East

    Main Contractor : Shapoorji Pallonji Mideast L.L.C

    Scope of Work: 

    The frame work consists of 28 no’s individual cassettes accommodating several MEP and allied utility lines, tracks, pipes etc. and the evaluation shall adhere to applicable design codes and standards to deduce the performance of the proposed structural framework.

    EXPO 2020-MOBILITY SIGNATURE PAVILION


    Site/Location details : MOBILITY SIGNATURE PAVILION 

    Client : EXPO 2020

    Local Consultant : WSP

    Main/MEP Contractor : ALEC Engineering & Contracting L.L.C

    Scope of Work:   

    · Modelling and FE Analysis of Secondary Beam, Drop Down Columns, and mounting frame.

    · Structural Analysis (FEA) of support to validate for structural integrity against dead loads applicable.

    EXPO 2020-MOBILITY SIGNATURE PAVILION

     

    Site/Location details : MOBILITY SIGNATURE PAVILION 

    Client : EXPO 2020

    Local Consultant : WSP

    Main/MEP Contractor : ALEC Engineering & Contracting L.L.C 

    Scope of Work: 

    Finite Element Analysis (FEA) of structure to validate for structural integrity against applicable loads for Deck slab structure.


    Computational Fluid Dynamic Studies

    MEYDAN ONE MALL

    Contractor: Meydan Sobha.

    Consultant: Ae7

    Client: Emaar

    Scope of Work: 

    To examine the designed ventilation system for the car

    parking area in the “Meydan One mall, Basement 1 using CFD. To simulate the ducted extract system and makeup air. The simulations are carried out to study the system requirements on basis of safety regulations and standards pertaining to Dubai civil defense. And also to check whether it meets the sufficient visibilities & temperatures in case of fire.

    MEYDAN ONE MALL

    Contractor: Meydan Sobha.
    Consultant: Ae7
    Client: Emaar
    Scope of Work:
    •  Carbon Monoxide Simulation carried out Following two references suggest that PPM level should be maintained at or below 30-35ppm.


     •   Abu Dhabi Occupational Safety and Health System Framework, Occupational Standards and Guideline Values (July 2016).


     •  AESG, Ambient Outdoor Air quality Standards in UAE

    MEYDAN ONE MALL

    Contractor: Meydan Sobha. 

    Consultant: Ae7 

    Client: Emaar 

    Scope of Work: 

     • Each of 9 vehicles (out of maximum 187 cars, 5% cars are chosen) emitting 46.25mg/s à (reference: ASHRAE Handbook).

    • Jet fans operating at maximum capacity.

    Copyright © 2018 AAPL Consultants - All Rights Reserved.